Toronto substation interconnection queue

1 active project totaling 1 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
1active MW
2total filed
Queue IDProjectkVMWResourceStatus
G803 Not reported 115 150 Wind Withdrawn
G340 Not reported 41.6 1 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.