Substation Scout

Texas Eastern F SS - Strong SS Line Tap substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Texas Eastern F SS - Strong SS Line Tap as the point of interconnection, all in Union County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1443 Not reported 115 100 Solar Withdrawn
J1484 Not reported 115 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first