Talisheek - Bogalusa Line substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Talisheek - Bogalusa Line as the point of interconnection, all in Washington Parish, LA.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1564 Not reported 230 100 Solar Active
J1505 Not reported 230 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.