Sugar Creek Substation substation interconnection queue

1 active project totaling 578 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
578active MW
2total filed
Queue IDProjectkVMWResourceStatus
G780 Not reported n/r 578 Gas Operational
G546 Not reported 138 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.