Sugar Creek - Cayuga CT substation interconnection queue

2 active projects totaling 1,740 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
1,740active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3999 Not reported 345 1,540 Gas Active
J3694 Not reported 345 300 Battery Withdrawn
J2587 Not reported 345 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.