Substation Scout

SUB T HASKINS substation interconnection queue

2 active projects totaling 725 MW in the MISO queue.

2 MISO queue filings name SUB T HASKINS as the point of interconnection, all in Washington County, IA.

2active projects
725active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4114 Not reported n/r 525 Gas Active
J2002 Not reported n/r 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first