STUTTGART RICUSKEY - WOODWARD 230 SUB substation interconnection queue

7 active projects totaling 1,260 MW in the MISO queue, plus 3 with terminal status (shown grayed).

10 MISO queue filings name STUTTGART RICUSKEY - WOODWARD 230 SUB as the point of interconnection, all in AR.

7active projects
1,260active MW
10total filed
Queue IDProjectkVMWResourceStatus
J3511 Not reported 230 250 Solar Withdrawn
J4080 Not reported 230 250 Solar Active
J3457 Not reported 230 215 Solar Active
J3435 Not reported 230 210 Solar Withdrawn
J3974 Not reported 230 200 Solar Active
J3984 Not reported 230 200 Hybrid Active
J2574 Not reported 230 172 Hybrid Withdrawn
J2759 Not reported 230 170 Solar Active
J2880 Not reported 230 150 Hybrid Active
J2010 Not reported 230 75 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.