STUTTGART RICUSKEY - WOODWARD 230 SUB substation interconnection queue
7 active projects totaling 1,260 MW in the MISO queue, plus 3 with terminal status (shown grayed).
10 MISO queue filings name STUTTGART RICUSKEY - WOODWARD 230 SUB as the point of interconnection, all in AR.
7active projects
1,260active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3511 | Not reported | 230 | 250 | Solar | Withdrawn |
| J4080 | Not reported | 230 | 250 | Solar | Active |
| J3457 | Not reported | 230 | 215 | Solar | Active |
| J3435 | Not reported | 230 | 210 | Solar | Withdrawn |
| J3974 | Not reported | 230 | 200 | Solar | Active |
| J3984 | Not reported | 230 | 200 | Hybrid | Active |
| J2574 | Not reported | 230 | 172 | Hybrid | Withdrawn |
| J2759 | Not reported | 230 | 170 | Solar | Active |
| J2880 | Not reported | 230 | 150 | Hybrid | Active |
| J2010 | Not reported | 230 | 75 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.