Stowell substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3 MISO queue filings name Stowell as the point of interconnection, all in TX.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2910 Not reported 230 303 Wind Withdrawn
J3262 Not reported n/r 300 Wind Withdrawn
J1812 Not reported 230 294.3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.