Storden - Heron Lake substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Storden - Heron Lake as the point of interconnection, all in Cottonwood County, MN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
H018
Not reported
161
150
Wind
Withdrawn
G769
Not reported
161
50
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner