Substation Scout

Stone Lake - Gardner Park substation interconnection queue

2 active projects totaling 606.5 MW in the MISO queue.

2 MISO queue filings name Stone Lake - Gardner Park as the point of interconnection, all in WI.

2active projects
606.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3975 Not reported 345 416.5 Solar Active
J3204 Not reported 345 190 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.