Home / MISO / Substations / Starhill Substation
Starhill Substation substation interconnection queue
1 active project
totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).
2 MISO queue filings name Starhill Substation as the point of interconnection, all in East Feliciana Parish, LA.
1 active projects
100 active MW
2 total filed
Queue ID Project kV MW Resource Status
J3128
Not reported
138
100
Solar
Active
J3129
Not reported
138
50
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.