Starhill Substation substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Starhill Substation as the point of interconnection, all in East Feliciana Parish, LA.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3128 Not reported 138 100 Solar Active
J3129 Not reported 138 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.