Substation Scout

Split Rock Substation substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
G731 Not reported n/r 750 Wind Withdrawn
J151 Not reported n/r 350 Wind Withdrawn
H016 Not reported 115 200 Wind Withdrawn
J183 Not reported n/r 200 Wind Operational
G829 Not reported 115 100 Wind Withdrawn
J184 Not reported 115 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.