South Valparaiso Substation substation interconnection queue

2 active projects totaling 150 MW in the MISO queue.

2 MISO queue filings name South Valparaiso Substation as the point of interconnection, all in Porter County, IN.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1407 Not reported 138 100 Solar Active
J3140 Not reported 138 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.