Substation Scout

Slate Substation substation interconnection queue

2 active projects totaling 300 MW in the MISO queue.

2 MISO queue filings name Slate Substation as the point of interconnection, all in Gratiot County, MI.

2active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
J533 Not reported 345 200 Wind Operational
S1020 Surplus; Polaris Solar 345 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.