SHERIDAN EHV - EL DORADO EHV substation interconnection queue

3 active projects totaling 1,060 MW in the MISO queue, plus 6 with terminal status (shown grayed).

9 MISO queue filings name SHERIDAN EHV - EL DORADO EHV as the point of interconnection, all in AR.

3active projects
1,060active MW
9total filed
Queue IDProjectkVMWResourceStatus
J2395 Not reported 500 500 Solar Active
J3386 Not reported 500 500 Solar Withdrawn
J3937 Not reported 500 500 Solar Withdrawn
J2396 Not reported 500 400 Solar Active
J3388 Not reported 500 400 Solar Withdrawn
J3711 Not reported 500 400 Solar Withdrawn
J2640 Not reported 500 394.5 Solar Withdrawn
J3567 Not reported 500 200 Battery Withdrawn
J2397 Not reported 500 160 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.