SEASIDE substation interconnection queue

2 active projects totaling 250 MW in the MISO queue.

2 MISO queue filings name SEASIDE as the point of interconnection, all in Huron County, MI.

2active projects
250active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3419 Not reported n/r 150 Solar Active
J3421 Not reported n/r 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.