Substation Scout

Schahfer - Burr Oak Line substation interconnection queue

6 active projects totaling 1,197 MW in the MISO queue.

6 MISO queue filings name Schahfer - Burr Oak Line as the point of interconnection, all in Jasper County, IN.

6active projects
1,197active MW
6total filed
Queue IDProjectkVMWResourceStatus
J1333 Not reported 345 199.5 Hybrid Operational
J1334 Not reported 345 199.5 Hybrid Operational
J1335 Not reported 345 199.5 Hybrid Operational
J1336 Not reported 345 199.5 Hybrid Active
J1339 Not reported 345 199.5 Hybrid Active
J1340 Not reported 345 199.5 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first