Sandborn Primary - Worthington Primary substation interconnection queue

2 active projects totaling 425 MW in the MISO queue.

2 MISO queue filings name Sandborn Primary - Worthington Primary as the point of interconnection, all in Greene County, IN.

2active projects
425active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3114 Not reported 161 300 Hybrid Active
J2826 Not reported 161 125 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.