San Souci Substation substation interconnection queue

1 active project totaling 10 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name San Souci Substation as the point of interconnection, all in Mississippi County, AR.

1active projects
10active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1078 Not reported 500 300 Solar Withdrawn
J1146 Not reported 500 10 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.