Rodemacher substation interconnection queue

1 active project totaling 775 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Rodemacher as the point of interconnection, all in Rapides Parish, LA.

1active projects
775active MW
2total filed
Queue IDProjectkVMWResourceStatus
E0048 Not reported n/r 775 Gas Active
J1999 Not reported n/r 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.