Rockdale Substation substation interconnection queue

2 active projects totaling 375 MW in the MISO queue.

2 MISO queue filings name Rockdale Substation as the point of interconnection, all in Dane County, WI.

2active projects
375active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1214 Not reported 345 300 Solar Active
J1326 Not reported 345 75 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.