Substation Scout

Rock River Substation substation interconnection queue

2 active projects totaling 655 MW in the MISO queue.

2 MISO queue filings name Rock River Substation as the point of interconnection, all in Rock County, WI.

2active projects
655active MW
2total filed
Queue IDProjectkVMWResourceStatus
G035 Not reported 138 505 Gas Operational
G072 Not reported n/r 150 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first