Substation Scout

Robinsonville substation interconnection queue

2 active projects totaling 359 MW in the MISO queue.

2 MISO queue filings name Robinsonville as the point of interconnection, all in MS.

2active projects
359active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2047 Not reported 230 199 Solar Active
J3175 Not reported 230 160 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first