Substation Scout

RILLA - RIVERTON substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name RILLA - RIVERTON as the point of interconnection, all in Ouachita Parish, LA.

1active projects
100active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2816 Not reported 115 100 Solar Active
J4156 Not reported 115 93 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.