Richard substation interconnection queue

2 active projects totaling 175 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name Richard as the point of interconnection, all in Acadia Parish, LA.

2active projects
175active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1904 Not reported 138 100 Solar Active
J1561 Not reported 138 75 Solar Active
J2415 Not reported 138 75 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.