Substation Scout

Reynolds--Burr Oak line substation interconnection queue

2 active projects totaling 945 MW in the MISO queue.

2 MISO queue filings name Reynolds--Burr Oak line as the point of interconnection, all in Pulaski County, IN.

2active projects
945active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2846 Not reported 345 700 Solar Active
J2849 Not reported 345 245 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first