Reid EHV substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Reid EHV as the point of interconnection, all in KY.

1active projects
150active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3089 Not reported n/r 696 Gas Withdrawn
J1696 Not reported 161 150 Solar Active
J3033 Not reported 345 75 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.