REGAL substation interconnection queue

2 active projects totaling 200 MW in the MISO queue.

2 MISO queue filings name REGAL as the point of interconnection, all in Gratiot County, MI.

2active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2026 Not reported n/r 100 Battery Active
J3268 Not reported n/r 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.