Substation Scout

Red Gum substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Red Gum as the point of interconnection, all in Concordia Parish, LA.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1953 Not reported 115 264.6 Solar Withdrawn
J2228 Not reported n/r 200 Solar Active
J2430 Not reported 115 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first