Substation Scout

Quinn substation interconnection queue

2 active projects totaling 400 MW in the MISO queue.

2 MISO queue filings name Quinn as the point of interconnection, all in Franklin County, IA.

2active projects
400active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1867 Not reported n/r 200 Wind Active
S1113 Surplus; J416 n/r 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first