0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Praire - Winger as the point of interconnection, all in Polk County, MN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2286 Not reported 230 90 Solar Withdrawn
J2285 Not reported n/r 45 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.