Substation Scout

Port Calcite - Riggsville Line substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Port Calcite - Riggsville Line as the point of interconnection, all in MI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J832 Not reported 138 100 Solar Withdrawn
J890 Not reported 138 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.