0 active projects
totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).
3 MISO queue filings name Point Substation as the point of interconnection, all in Posey County, IN.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
J1274
Not reported
69
100
Hybrid
Withdrawn
J1276
Not reported
69
100
Hybrid
Withdrawn
J332
Not reported
n/r
90
Gas
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.