Pleasant Valley Substation substation interconnection queue

2 active projects totaling 458.9 MW in the MISO queue, plus 6 with terminal status (shown grayed).

8 MISO queue filings name Pleasant Valley Substation as the point of interconnection, all in MN.

2active projects
458.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
S1009 Surplus; Pleasant Valley Peaker 161 258.9 Hybrid Active
G362 Not reported n/r 200 Wind Operational
J2022 Not reported 345 200 Solar Withdrawn
G762 Not reported 345 150.4 Wind Withdrawn
J182 Not reported n/r 150 Wind Withdrawn
G910 Not reported 345 99 Wind Withdrawn
G911 Not reported 345 99 Wind Withdrawn
G912 Not reported 345 99 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.