Substation Scout

Pleasant Prairie - Arcadian substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Pleasant Prairie - Arcadian as the point of interconnection, all in Kenosha County, WI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3330 Not reported 345 705 Gas Withdrawn
J4020 Not reported 345 481 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first