Pleasant Hill Substation substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Pleasant Hill Substation as the point of interconnection, all in Conway County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2458 Not reported 500 100 Battery Withdrawn
J2511 Not reported 500 85 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.