Pine River Substation substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Pine River Substation as the point of interconnection, all in Chippewa County, MI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J119 Not reported 69 61.2 Wind Withdrawn
J066 Not reported 69 60 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.