Peddler substation interconnection queue

1 active project totaling 198 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Peddler as the point of interconnection, all in Ionia County, MI.

1active projects
198active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3220 Not reported n/r 200 Battery Withdrawn
J4055 Not reported n/r 198 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.