0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Panther Substation as the point of interconnection, all in Renville County, MN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J556
Not reported
230
102
Wind
Withdrawn
J1645
Not reported
230
80
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.