Pana substation interconnection queue

1 active project totaling 250 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Pana as the point of interconnection, all in Christian County, IL.

1active projects
250active MW
3total filed
Queue IDProjectkVMWResourceStatus
J4198 Not reported 138 250 Battery Active
J3239 Not reported 138 175 Wind Withdrawn
J2461 Not reported 138 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.