OTP Sheyenne - Audubon substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name OTP Sheyenne - Audubon as the point of interconnection, all in Clay County, MN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G821 Not reported 230 199.5 Wind Withdrawn
H099 Not reported 230 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.