OTP Big Stone Substation substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name OTP Big Stone Substation as the point of interconnection, all in SD.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
G939
Not reported
230
250
Wind
Withdrawn
J266
Not reported
345
200
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.