0 active projects
totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).
3 MISO queue filings name Oneida Substation as the point of interconnection, all in Eaton County, MI.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
J820
Not reported
345
100.1
Wind
Withdrawn
J1178
Not reported
138
65
Solar
Withdrawn
J1192
Not reported
138
35
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.