North Beaver Dam Substation substation interconnection queue

1 active project totaling 50 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name North Beaver Dam Substation as the point of interconnection, all in Dodge County, WI.

1active projects
50active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1003 Not reported 69 50 Solar Operational
J1345 Not reported 69 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.