Newton Substation substation interconnection queue

1 active project totaling 51.8 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
51.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
J1198 Not reported 345 51.8 Hybrid Active
J1206 Not reported 138 50 Gas Withdrawn
J1207 Not reported 138 50 Gas Withdrawn
J881 Not reported 138 45 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.