Substation Scout

NELSON 500 SWYD - RICHARD substation interconnection queue

4 active projects totaling 940 MW in the MISO queue, plus 1 with terminal status (shown grayed).

5 MISO queue filings name NELSON 500 SWYD - RICHARD as the point of interconnection, all in Jefferson Davis Parish, LA.

4active projects
940active MW
5total filed
Queue IDProjectkVMWResourceStatus
J4076 Not reported 500 400 Battery Active
J3322 Not reported 500 325 Solar Withdrawn
J4050 Not reported 500 220 Solar Active
J4051 Not reported 500 220 Solar Active
J4052 Not reported 500 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first