Substation Scout

MURPHY substation interconnection queue

2 active projects totaling 450 MW in the MISO queue.

2 MISO queue filings name MURPHY as the point of interconnection, all in Saginaw County, MI.

2active projects
450active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3438 Not reported n/r 250 Battery Active
J2061 Not reported n/r 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.