Monticello Substation substation interconnection queue

1 active project totaling 60.8 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
60.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
G884 Not reported n/r 1,500 Wind Withdrawn
G899 Not reported 345 1,000 Wind Withdrawn
G929 Not reported n/r 60.8 Nuclear Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.