Substation Scout

MOLER - COLFEL substation interconnection queue

2 active projects totaling 237 MW in the MISO queue.

2 MISO queue filings name MOLER - COLFEL as the point of interconnection, all in LA.

2active projects
237active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2651 Not reported 230 160 Solar Active
J3630 Not reported 230 77 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first