MINDEN substation interconnection queue

2 active projects totaling 240 MW in the MISO queue.

2 MISO queue filings name MINDEN as the point of interconnection, all in Huron County, MI.

2active projects
240active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3967 Not reported n/r 170 Wind Active
J3970 Not reported n/r 70 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.